Signing a contractor's quote? Check these first
Once you sign, the quote becomes the rulebook for the whole job: what gets done, what it costs, when you pay. Most disputes between homeowners and contractors trace back to something the quote didn't say. Go through this list with the quote open, ask for anything missing to be added, and only then sign.
Already subscribed? Sign in
- 1Tick off each itemMark what the quote covers clearly, what it covers vaguely, and what it doesn't mention.
- 2Ask about the gaps in writingEmail the contractor your questions and ask for an updated quote, not just a verbal answer.
- 3Sign the final versionSign the updated PDF in the signer on this page, send it back, and keep it with the emails that led to it.
Updated 27 October 2026 · Written by Joe Farwick, who runs this site
The arguments a complete quote prevents
“That wasn't included.” A line-by-line scope and a materials list — brand, model or grade — settle it before anyone picks up a tool.
“We'll finish next month.” A start date and an expected completion date, plus what happens if either slips, set expectations on both sides.
“Pay the rest now.” Payments tied to finished stages mean the money never runs far ahead of the work.
1. Who you are hiring
The quote should name the business, its address and phone number and, where the trade is licensed, its license number. The US Federal Trade Commission lists exactly these details as things a contract should contain. Check the license with the issuing body and ask for proof of insurance; a name and a mobile number alone make it hard to follow up if something goes wrong.
2. Scope and materials
Every part of the job should be listed, including preparation, removal of old materials, waste disposal and cleaning up. Materials should be identified precisely enough to check: a make and model for fixtures, a grade or product line for timber, tiles or paint. “Allowances” — a set budget for items you'll choose later — should state the amount and what happens if you spend more or less.
3. Price, deposit and payment stages
Confirm whether the total is fixed or estimated and whether tax is included. Then look at how much is due up front. Advice varies by country, and some places set legal limits. Citizens Advice in the UK recommends agreeing to no more than 25% as a deposit. Ontario's consumer ministry recommends keeping down payments to no more than 10%. In California, the down payment on a home improvement contract can't exceed $1,000 or 10% of the contract price, whichever is less, and later payments can't run ahead of the work done. The FTC advises never paying the whole price before the work starts.
After the deposit, look for stage payments tied to visible progress — “on completion of framing”, “after inspection” — and a final payment due only when the work is finished to your satisfaction.
4. Schedule, permits and site rules
Look for an estimated start date and completion date, and what counts as an acceptable delay (weather, supplier lead times, inspections). The quote should say who applies for any building permits and pays for them, and who books inspections. For work in an occupied home, agree working hours, access, parking and where materials will be stored.
5. Warranty, subcontractors and clean-up
What guarantee applies to the workmanship, and for how long? Are manufacturer warranties on materials passed on to you? If parts of the job go to subcontractors — electrics, plumbing, plastering — the quote should say so and make clear who pays them. Ontario's list of what a home renovation contract must include covers both sub-trades and clean-up, which is a good benchmark anywhere.
6. Changes, validity and cancellation
The quote should say that extra work is priced and agreed in writing — a signed change order — before it is done. Note the “valid until” date, and make sure there are no blank spaces left in the document when you sign it.
If you sign at home rather than at the contractor's premises, you may have a right to cancel within a short cooling-off period, and in the US the FTC says the contract should include a written statement of that three-business-day right. The length and conditions vary by country and province.
Comparing two or three quotes
Citizens Advice suggests getting written quotes from at least three traders. To compare them fairly, check that they price the same scope: one may include plastering and waste removal while another leaves them out. The FTC warns against automatically taking the lowest bid and suggests asking contractors to explain big price differences. A quote that is far cheaper than the others often has gaps rather than savings.
Contractor quote questions
- How do I respond to a contractor's quote?
- If it's complete, sign it and send it back with a short note confirming the start date. If not, reply with your questions and ask for an updated quote before signing.
- Can I sign on my phone at the site?
- Yes. Open the PDF in your phone's browser, sign with your finger and email the signed file back.
- Is this checklist legal advice?
- No. For large renovations or unusual contract terms, have the contract reviewed by a professional where you live.
- What does it cost to sign the quote once it passes the checklist?
- Placing and checking your signature on the quote is free. Downloading the signed PDF costs €2.99 for a month or €24.99 for a year. A month covers every quote and change order you sign in that month, and if you cancel before it renews, access lasts until the month ends.
Choose the PDF the contractor sent, put your signature and the date on the acceptance line, and download the signed copy to reply with.
Loading editor...
How to use the checklist
Twenty minutes, the quote on one side and this page on the other.
- 1
Tick off each item
Mark what the quote covers clearly, what it covers vaguely, and what it doesn't mention.
- 2
Ask about the gaps in writing
Email the contractor your questions and ask for an updated quote, not just a verbal answer.
- 3
Sign the final version
Sign the updated PDF in the signer on this page, send it back, and keep it with the emails that led to it.
Everything checks out?
Open the quote above and sign it — the file never leaves your device.
Choose the quote