Approving an estimate without surprises

An estimate is a forecast, and approving it usually means “go ahead on this basis”. The final bill can still move. A few minutes spent on the assumptions, the exclusions and a written limit for overruns turns a vague number into something you can hold the business to — then sign the approval and send it back.

Check the assumptionsPut a ceiling in writingSign the approval

Already subscribed? Sign in

  1. 1What is the number based on?Every estimate assumes something: square footage, hours, the state of what's behind the wall. Ask which assumptions could move the price most.
  2. 2What is left out?Permits, materials you'll choose later, skip hire, travel, making good after the work. Ask for exclusions to be listed.
  3. 3What happens if it runs over?Agree up front that the business stops and asks before going beyond an amount you name.

Updated 27 October 2026 · Written by Joe Farwick, who runs this site

What “approved” means on an estimate

When you approve an estimate you usually authorise the work on the terms written in it — the description, the rates and the assumptions — while accepting that the total is a forecast rather than a promise. That is the main difference from a quote, which normally fixes the price for the work described.

How far the final bill may drift from an estimate depends on where you are. In Ontario, a business can't bill a consumer more than 10% above an estimate unless the consumer agrees to the extra charges in writing. New Zealand's consumer protection agency says the final price should generally be within 10–15% of an estimate. In the UK, Citizens Advice says the final price for estimated work should be reasonable. In the US, rules differ by state and trade. A written ceiling on your approval works everywhere, because it becomes part of what you agreed.

Four ways to keep an estimate honest

A written ceiling: “Not to exceed $6,000 including tax without my written approval.” One sentence next to your signature.

A stop-and-call rule: ask to be contacted before extra work starts, with the reason and the price, rather than finding out on the invoice.

Stages instead of one lump: approve and pay phase by phase — demolition, then rebuild — so a surprise in phase one doesn't carry into phase two unchecked.

One folder for the paper trail: the signed estimate, every signed change and the emails about them. It settles most arguments about the final bill.

How to write a limit into your approval

Add one sentence next to or under your signature before you sign. Examples: “Approved up to $6,000 including tax. Anything above this needs my written approval first.” Or: “Approved for phase 1 (strip-out and survey) only; phase 2 to be quoted after the survey.”

In the signer on this page, use Add Text to place the sentence, then your signature and the date. If the estimate has no room for it, the free acceptance-page builder adds a page where the limit goes into the notes. Either way, mention the limit in your reply email too, so it is in the thread as well as in the PDF.

Don't change the business's own figures or cross out their terms. If you disagree with part of the estimate, ask for a revised version and approve that one.

Hourly estimates from agencies and freelancers

Design, marketing, software and consulting estimates are usually hours multiplied by a rate, sometimes as a range such as “40–55 hours”. Before approving, ask what the top of the range assumes, how many rounds of revisions are included, and how hours are reported. A weekly hours update lets you stop or re-scope early instead of meeting the overrun at the end.

For longer projects, approve one phase at a time: discovery first, then design, then build. Each phase gets its own short estimate and its own signature, and the later phases are priced with better information.

Car, appliance and other repair estimates

Repair shops often need your approval before they start, and they may find more once things are taken apart. Ask them to call you with the price before doing anything beyond the approved work. Some places write this into law: in California, an auto repair dealer must tell you the revised total and get your authorisation before charging for parts or labour beyond the estimate, and in Ontario an auto repair invoice can't be more than 10% above the written estimate.

Estimates themselves aren't always free, especially when finding the fault takes work. If a shop charges for the estimate, ask about the fee before you hand over the car or the appliance. Ontario requires auto repairers to tell you about an estimate fee in advance.

Sources

Estimate approval questions

Can I add a note before signing?
Yes. Use Add Text in the signer to place a sentence such as “Approved up to $6,000 including tax” next to your signature, then sign and date.
The final bill is higher than the estimate. What now?
Ask for a written breakdown of the difference and the reasons. Compare it with your signed approval and any signed changes; if you set a ceiling, point to it.
Should I pay a deposit on an estimate?
Deposits are common for materials. Keep the deposit small, tie it to the approved amount, and get a receipt that names the estimate number.
What does it cost to sign an estimate approval here?
Placing your signature, the date and a note such as a spending limit is free to try. To download the signed approval you need a plan — €2.99 per month or €24.99 per year — and you can cancel whenever you like; access continues until the paid period is over.

Choose the PDF the contractor sent, put your signature and the date on the acceptance line, and download the signed copy to reply with.

Loading editor...

Three questions before you approve

Ask them with the estimate open. Get the answers in writing.

  1. 1

    What is the number based on?

    Every estimate assumes something: square footage, hours, the state of what's behind the wall. Ask which assumptions could move the price most.

  2. 2

    What is left out?

    Permits, materials you'll choose later, skip hire, travel, making good after the work. Ask for exclusions to be listed.

  3. 3

    What happens if it runs over?

    Agree up front that the business stops and asks before going beyond an amount you name.

Sign the approval

Add your limit, sign, date and send it back.

Choose the estimate